Customization: | Available |
---|---|
Conditions of Use: |
Generator |
Usage: | Aisikai ATS Controller |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
SKR2-A ATS intelligent controller module
Power input
Controller AC power supply: AC230V (50/60Hz) Soil 30% (I, II road A, N phase voltage)
Controller DC power supply: DC (9~35)V between VIN and GND
Detection voltage: rated phase voltage 220V 50/60Hz three-phase four-wire other detection voltage level, please consult before
ordering
Abnormal power supply Overvoltage AC265V ± 5V ; Undervoltage AC180V ± 5V
2. Action time
Closing time: 5 seconds. If the switch closing status signal is detected during the closing process, the opening time is
immediately turned off for 5 seconds. If the switch closing status signal is detected during the opening process, the effect is
immediate. Disconnect power supply normal delay: (1~60) seconds (panel potentiometer adjustment)
Power supply abnormal delay: (1~60) seconds, factory default: 5 seconds (can be adjusted by button)
Start-up delay of generator set: After the abnormal confirmation of I road, the delay starts (1 - 60) seconds, the factory default
value is 5 seconds (can be adjusted by button). Delay of generator set stop: After the normal confirmation of I channel, the delay
starts (1 - 60) seconds, factory default: 60 seconds (can be adjusted by button)
3. I/II closing status detection (button programmable)
Factory default: Detect I/II closing status input, ie the controller must be connected to the closing status signal
0 Power consumption The power consumption of the voltage loop of the device at rated voltage is not more than 2VA.
0 Ambient conditions Temperature: (-3o~+?or e Relative humidity: (20 - 95)%RH
Fu'an Shaluo Electronics co.Ltd is a manufacturer of generator accessories, Our company has established a long term and stable business relationship with a number of domestic agents and retailers.
The professional person responsible for the quality of supervision and control in the entire process.
In order to get the superior quality we only use selected good element.
Aimed at enabling the production department to manufacture and assemble the product as efficiently as possible.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.