Customization: | Available |
---|---|
Conditions of Use: |
Generator |
Usage: | Generator |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
main technical parameters:
Voltage: AC220V/110V
Power: 1.55KW
Insulation resistance: cold or hot than 50M 10M.
Leakage current: working condition is less than or equal to 0.5mA/KW
Pressure resistance: 1500V/min
Temperature range: 30-50 DEG C
Apply pressure: less than 0.8Mpa
Water jacket heater installation method:
1, clear the cooling water of the unit.
2. Select the appropriate position on the floor beam of the unit, fix the heater level on the base beam with the bolt and make the
water outlet up.
3, we should talk about the inlet of the heater (horizontal interface), and connect the hose to the down pass way of the water
tank. The outlet (vertical interface) is connected with the upper water channel hole of the body to fasten the clamps at the ends
of the inlet and outlet rubber pipes so as to prevent water leakage.
4, open the rear cover of the heater housing and connect the power line and the grounding protection line to the terminal and
cover the housing.
5. Check the position of the heater and the components in the pipes is correct, and the components are installed firmly.
6, to fill the unit cooling water after starting the engine (two minutes), so that the birds get the full cycle of water within
the unit, in order to clear the air inside the pipe unit, and check whether there is a new line Water Leakage phenomenon.
7, standby group can shut the heating power after shutdown. At this time, the heater should be in working state, and the
temperature of the outlet of the handle heater should gradually increase. Otherwise, the power should be cut off immediately, then
the air in the pipeline should be removed again, and then the electricity will be activated again.
Safe use:
1, water jacket heater working voltage is divided into ~220V; ~280; -24V; -36V; -48V; oil heater working voltage is divided into
~220V; -24V; -36V; -48V; users should choose suitable heater according to their own conditions of use.
2, the heater installation should be good grounding!!!
3, the water heater should check whether the machine cooling water meets the operation requirements before switching on the power
supply. The valve installed on the heater inlet and outlet pipe should check whether the valve is in the open state.
4, cooling water cooling water should be clean without debris, long-term use of the Greyhound contains a variety of debris and
dirt, to ensure the safe operation of the heater can loosen the screws at the lower part of the heater drain off dirt and debris.
When the group in the water circulation system with more debris and dirt is will seriously affect the service life of the heater,
this time should be timely discharge of cooling water, and injected into the cooling water system of water cleaning cleaning unit.
Fu'an Shaluo Electronics co.Ltd is a manufacturer of generator accessories, Our company has established a long term and stable business relationship with a number of domestic agents and retailers.
The professional person responsible for the quality of supervision and control in the entire process.
In order to get the superior quality we only use selected good element.
Aimed at enabling the production department to manufacture and assemble the product as efficiently as possible.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent,
we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and
the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.